Skip to main content

Hedge Cost Index May 2019

6 June 2019
The expected hedge cost for a hypothetical lifetime GMWB block (see Index Methodology1) is estimated to be 159 bps as of the end of May 2019, up 17 basis points from the previous month, driven by a decrease in long-term interest rates.

Explore more tags from this article

About the Author(s)

We’re here to help