Skip to main content

Hedge Cost Index July 2018

2 August 2018
The expected hedge cost for a hypothetical lifetime GMWB block (see Index Methodology1) is estimated to be 107 bps as of the end of July 2018, down 6 basis points from the previous month, driven by an increase in long-term interest rates.

About the Author(s)

We’re here to help