Skip to main content

Hedge Cost Index February 2018

2 March 2018
The expected hedge cost for a hypothetical lifetime GMWB block is estimated to be 110 bps as of the end of February 2018, down 6 basis point from the previous month, driven by an increase in long-term interest rates.

About the Author(s)

We’re here to help