Hedge Cost Index January 2019

  • Print
  • Connect
  • Email
  • Facebook
  • Twitter
  • LinkedIn
  • Google+
By Ram Kelkar, Daren Lockwood, Xiaohong Mo, Adam Schenck | 03 January 2019
The expected hedge cost for a hypothetical lifetime GMWB block (see Index Methodology1) is estimated to be 117 bps as of the end of January 2019, up 1 basis point from the previous month, driven by a decrease in long-term interest rates.

Authors

Risk Management and Financial Services